Sewage plant

Change control cabinets of an intermediate pumping station

The following services (priorities) were produced:
- Project coordination
- Electrical engineering
- Control cabinet construction
- Software development
- Electroinstallation and I/O check
- Commissioning and training of customer staff
- Documentation
- Services

Control system, visualisation system, network system and specific features were moved as follows:
- 1 Siemens Sinamics S7-300 control system
- 1 Siemens touch panel 8inch
- Siemens Simatic WinCC flexible
- Profinet and Profibus
- 1 Siemens Sentron energy measurement